hamilton bathroom renovation before after

Project Highlights

In this Hamilton bathroom remodel, we remodeled two bathrooms within a period of 14 days. The remodel included stripping the bathtubs, showers, toilets, vanities, tiles, and plaster that were already in place. We also added R-24 insulation to the exterior walls for better energy efficiency.

Both bathrooms upgrade in Hamilton were given new bathtubs, faucets, and custom shower niches along with benches. We installed UltraLight Mold Tough drywall, waterproofing membrane, and added new lighting, including a new exhaust fan and 4000K spotlights. To finish, we installed PVC UV Marble White Sheets, added designer tiles, and painted walls and ceilings with premium Sherwin-Williams paint.

Highlights of this Hamilton bathroom project:

  • Removed old fixtures, tiles, and plaster
  • Added R-24 insulation to exterior walls
  • Installed new bathtubs, faucets, and shower niches
  • Used waterproof drywall and a membrane for durability
  • Installed new exhaust fan and 4000K spotlights
  • Used PVC UV Marble White Sheets and installed new tiles
  • Painted walls and ceilings with Sherwin-Williams paint
  • Cleaned up and disposed of all debris