burlington bathroom renovation project

Project Highlights

This Burlington bathroom was completed in just 11 days, transforming an outdated space into a fresh, modern bathroom. Our team started by removing the old bathtub, toilet, vanity, wall and ceiling tiles, and all existing plaster. We then built a new bulkhead, installed R-24 insulation in the exterior walls, and used UltraLight Mold Tough drywall to ensure moisture resistance and long-term durability.

The project also included a new window installation, full electrical upgrades with a new exhaust fan and 4000K spotlights, and complete waterproofing using a membrane and waterproof drywall. We installed a new bathtub with updated fixtures, an assembled vanity with faucet, and tiled the walls and floor. The bathroom upgrade in Burlington was finished with Sherwin-Williams premium paint and a full clean-up of the work area.

Highlights of this Burlington bathroom project:

  • Removed old bathtub, vanity, toilet, and wall/ceiling tiles
  • Removed all plastering from walls and ceiling
  • Built bulkhead and installed R-24 insulation in exterior walls
  • Installed new window for added natural light
  • Electrical upgrades: new exhaust fan and 4000K spotlights
  • Installed waterproof drywall and waterproofing membrane
  • Installed UltraLight Mold Tough drywall
  • Installed new bathtub and faucet
  • Assembled vanity with faucet installation
  • Wall and floor tile installation
  • Recessed medical cabinet installation
  • Painted walls and ceiling with Sherwin-Williams premium paint
  • Work area clean-up and responsible waste disposal