free estimate
Stylish Bathroom Transformation

Service: Bathroom Remodel
Time span: 11 Days
Project Highlights
This Burlington bathroom was completed in just 11 days, transforming an outdated space into a fresh, modern bathroom. Our team started by removing the old bathtub, toilet, vanity, wall and ceiling tiles, and all existing plaster. We then built a new bulkhead, installed R-24 insulation in the exterior walls, and used UltraLight Mold Tough drywall to ensure moisture resistance and long-term durability.
The project also included a new window installation, full electrical upgrades with a new exhaust fan and 4000K spotlights, and complete waterproofing using a membrane and waterproof drywall. We installed a new bathtub with updated fixtures, an assembled vanity with faucet, and tiled the walls and floor. The bathroom upgrade in Burlington was finished with Sherwin-Williams premium paint and a full clean-up of the work area.
Highlights of this Burlington bathroom project:
- Removed old bathtub, vanity, toilet, and wall/ceiling tiles
- Removed all plastering from walls and ceiling
- Built bulkhead and installed R-24 insulation in exterior walls
- Installed new window for added natural light
- Electrical upgrades: new exhaust fan and 4000K spotlights
- Installed waterproof drywall and waterproofing membrane
- Installed UltraLight Mold Tough drywall
- Installed new bathtub and faucet
- Assembled vanity with faucet installation
- Wall and floor tile installation
- Recessed medical cabinet installation
- Painted walls and ceiling with Sherwin-Williams premium paint
- Work area clean-up and responsible waste disposal